Release date:2020-05-25 09:29:07
In October 2019, Shandong Zhongye Petroleum Machinery Co., Ltd. started construction of two heating furnaces. The first-stage flue gas volume was 30000m3 / h, the first-stage SCR high-temperature denitration, and the second-stage SCR low-temperature denitration phase were 20,000m3 / h . The nitrogen oxide content before transformation is 180mg / nm3, and the nitrogen oxide content after transformation is less than 30mg / nm3.
QQ:619449050